Do the job. The write-up's done.

The whole visit, from diagnosis to next steps. Talk through the job while you do it, and Blue builds your service summary in your format, with photos and recommendations, before you're back in the truck.

Book a Demo

Stuck? Work it through with Blue.

Work the problem with Blue. The diagnosis goes into the write-up automatically, so you don't have to repeat it.

Known fixes first. Your manuals and the fixes your senior techs have shared, with the page they came from.

Guesses stay labeled. Blue suggests. You make the call.

Snap the nameplate. Model and serial go into the job. Nothing to type.

Safety checks along the way. Wheels chocked. Breaker locked out.

How Blue troubleshoots
First-person footage of equipment in a mechanical room

“High discharge
pressure on the chiller.”

Start with what your team knows.
Known fixes first Your workspace
Chiller footage from Airwave's service demo
Manuals + your crew's fixesWith the source page

Talk through it. Skip the typing.

Start a job by voice. Keep the whole call together.

From diagnosis to completed work, your notes, photos and Blue's answers stay in the same job.

Before-and-after photos, timestamped and tied to the job. Show what changed in the service summary.

Quiet for an hour? The job stays open. Pick it back up by voice.

Not much of a talker? Photos and a few words will do.

Both hands on the work with the glasses. The phone app works too.

Arrival frame from the service demoWork in progress from the service demoFinal frame from the published service sample
200 Commerce Tower / Service Call

York chiller service

Ready for review

Found chiller condenser tubes fouled with mineral scale. Performed chemical descale, flushed cooling tower loop, replaced Y-strainer basket.

York chiller Service summary

Jason Rivera, ACS Apr 03, 2026
Chiller frame attached to the published sampleWORK PERFORMED

System restored to full operation

Chemical descale, cooling tower loop flush and Y-strainer basket replacement.

↗Recommendations included→

Your write-up. Your format. Ready to send.

Ask Blue for the write-up. Read it. Fix anything Blue got wrong. Then send it.

The 3Cs, or your own format. Complaint, cause and correction, or the write-up your company uses.

Before-and-after photos in the summary. Show the customer what changed.

Timestamped photos on the record. Proof of what you found and what you did, if anyone questions it later.

You choose what the customer sees. Keep internal photos in your own copy.

Ready for the customer or your FSM. Share a link without a login, paste the summary, or use an integration.

Turn recommendations into the next job

The worn belt. The unit nearing the end of its life. Record what needs doing next so the office can quote it.

Recommendations in the summary. Give the office the details to follow up.

Turn recommendations into estimates. Carry the same job details into a quote.

“Remind me Tuesday to call about the compressor.” Blue will.

AirwaveYork chiller service · Apr 3, 2026

Recommendations

  1. Schedule quarterly condenser cleaningRecommended · Not yet quoted
  2. Check the Y-strainer at the next PMRecommended · Not yet quoted
  3. Review cooling tower water treatmentRecommended · Not yet quoted

“I can’t always put my best tech on every job. But with Airwave, his expertise is accessible to the team and shows up on every job.”

Industrial Air Centers

Chris LeggOwner, Industrial Air Centers

Bring Airwave to your service calls

We set it up with your forms, your manuals and your crew.

Technicians working together under a vehicle
A moment from Meet Marshall.

York chiller service summary

200 Commerce Tower · Meridian Commercial Properties

AirwaveSample report

York chiller Service summary

Meridian Commercial Properties

Site
200 Commerce Tower, Mech Room B
Equipment
York YVAA0057 · Floors 1–3
Technician
Jason Rivera, ACS
Date
April 3, 2026

Work performed

Upon arrival, we identified a high discharge pressure alarm on the York YVAA0057 chiller serving floors 1–3. Inspection of the condenser revealed significant mineral scale buildup in the condenser tubes, traced to the cooling tower loop. We performed a full chemical descale treatment on the condenser barrel, flushed the cooling tower loop, and replaced the Y-strainer basket, which was approximately 60% blocked with sediment. Following service, the system was restored to full operation and confirmed stable under full load prior to departure. No further issues were identified at the time of service.

Service timeline

  1. Arrived Mechanical Room B. High discharge pressure alarm on the York YVAA0057 with reading of 285 PSI.

    Arrival footage from the published chiller sample
  2. Significant mineral scale buildup in the condenser tubes traced to the cooling tower loop. Beginning chemical descale.

    Condenser footage from the published chiller sample
  3. Flushed cooling tower loop and replaced Y-strainer basket blocked at approximately 60%.

    Service footage from the published chiller sample
  4. System restored to full load and confirmed stable. Discharge pressure 210 PSI. No further issues.

    Completion footage from the published chiller sample

Recommendations

Schedule quarterly condenser cleaning. Monitor Y-strainer basket at next PM. Consider water treatment review for cooling tower loop.

Airwave service demo · 0:32

How Jobs work

Everything from the call stays in one job: voice notes, photos, recordings and Blue's answers. Pick it back up by voice, even after a quiet stretch.

The full Jobs page is still to come.

See how Blue keeps track